Installation of two new speed bumps on Brookview Lane is scheduled for Friday, April 12, 2019.  The road crew will allow traffic to pass through during construction, closing only one side of the road at a time as they build each half of the speed bump.

  • One speed bump will be located just before you reach the first cluster mailbox on Brookview Ln when entering from Heritage Dr.
  • The other speed bump is located approximately where the cluster mailbox is next to 85 Brookview Ln.

On the same day, a new stop sign will be added on the upper end of Creekside Dr (facing outward), forcing traffic coming from the commercial section of Creekside Dr to stop before entering our neighborhood.